Detailed Images:
Parts List:
| Trans No. | Picture | Description | 
| 52-10003 | Diagnostics for heater | |
| 52-10004 | DA2 Motor (with brush) 12V | |
| 52-10005 | DA2 combustion chamber gasket | |
| 52-10006 | DA2 heat exchanger gasket | |
| 52-10007 | DA2 controller DC12 | |
| 52-10008 | DA2 oil pump | |
| 52-10009 | DA2 temperature sensor | |
| 52-10010 | DA2 glow plug | |
| 52-10011 | DA2 glow plug net cover | |
| 52-10012 | DA2 outlet pipe Φ60*0.6 m | |
| 52-10013 | DA2 air outlet Φ60 | |
| 52-10014 | DA4 motor assembly 12V | |
| 52-10015 | DA4 combustion chamber gasket | |
| 52-10016 | DA4 controller DC12 | |
| 52-10017 | DA4 oil pump | |
| 52-10018 | DA4 temperature sensor | |
| 52-10019 | DA4 glow plug | |
| 52-10020 | DA4 glow plug net cover | |
| 52-10021 | DA4 control switch (12V) | |
| 52-10022 | DA4 outlet pipe Φ90 0.6 m | |
| 52-10023 | DA4 air outlet Φ90 | |
| 52-10024 | DA4 rubber tubing 30cm | |
| 52-10025 | DA4 heat exchanger gasket | |
| 52-10026 | DA2 Air filter | |
| 52-10027 | DA2/DA4 control switch (24V) | |
| 52-10028 | DA2/DA4 oil pump | |
| 52-10029 | DA4 Burner Assembly | |
| 52-10030 | DA2 Burner Assembly | |
| 52-10033 | diesel Voltage: DC12 or DC24V heating Power:2400W-5000W Air flow 900±100 L/H Power Consumption:23W-50W fuel Consumption:0.27-0.62L/h Lowest working temperature:-40℃ Size:220*86*160mm Weight:2.3kg | |
| 52-10034 | DA4 Motor Assembly 24V (Brushless) | |
| 52-10035 | DA2 Motor Assembly 24V (Brushless) | |
| 52-10036 | Thomas imported Oil Pump(24V) | |
| 52-10037 | Knob Switch(24V) | |
| 52-10038 | DC12V imported Kyocera ignition plug | |
| 52-10039 | Thomas imported Oil Pump(24V) | |
| 52-10040 | DC24V imported Kyocera ignition plug | 
Packaging & Shipping
1. Neutral packing or color box with Brand or as your requirements.
2. Lead time: 10-20 days after deposit into our bank account.
3. Shipping: By Express (DHL, FedEx, TNT, UPS), By Sea, By Air, By Train
4. Export sea port: Ningbo, China
According to your actual needs, choose the most reasonable overall design and planning procedures