Top 10

of Chinese Stone Machinery

New type customized color alkyd anti-rust paint for metal protection

Introduction

By the alkyd resin, pigments, additives, solvents and other grind by the deployment of paint from the paint.

Product Details

Product Tags

*Vedio:

*Product Features:

. Good adhesion, high anti-rust performance;
. Strong water resistance;
. Bright color, bright and hard
. Good outdoor weather resistance.
. With good luster and psical and mechanical properties
. It can be dried at room temperature, but also low-temperature drying.

*Product Application:

. Used for chemical atmosphere, industrial atmosphere of various steel surface coating primer. Alkyd enamel (also known as alkyd finish)
. Suitable for steel and iron equipment, steel structure, and other outdoor products surface decoration protection.
. Widely used as bridges, steel structures, towers, vehicle equipment, all kinds of steel equipment and wood products surface coating.

*Technical Datas:

Item

Standard

Color

All colors

Fineness

≤35

Flash point, ℃

38

Dry film thickness, um

30-50

Hardness,H

≥0.2

Volatile content,%

≤50

Drying time (25 degrees C), H

surface dry≤ 8h, hard dry≤ 24h

Solid Content,%

≥39.5

Salt Water resistance

48 hrs, no blister, no fall off, no change color

Executive Standard:HG/T2455-93

*Construction Method:

1. Air spraying and brushing are acceptable.

2. The substrate should be cleaned before use, without oil, dust, rust, etc.

3. The viscosity can be adjusted with X-6 alkyd diluent.

4. When spraying the topcoat, if the gloss is too high, it must be polished evenly with 120 mesh sandpaper or after the surface of the previous coat is dried and the construction is done before it is dried.

5. Alkyd anti-rust paint can not be directly used on zinc and aluminum substrates, and it has poor weather resistance when used alone, and should be used in conjunction with topcoat.

*Surface Treatment:

The surface of the primer should be clean, dry and pollution-free. Please pay attention to the coating interval between the construction and the primer.
All surfaces must be clean, dry and free of contamination. Before painting, should be assessed and treated in accordance with standard of the ISO8504:2000.

*Construction condition:

The temperature of the base floor is not less than 5℃, and at least 3℃ than the air dew point temperature, the relative humidity must less than 85% (should be measured near the base material), fog, rain, snow, wind and rain is strictly prohibited construction.

 


  • Previous:
  • Next:

  • Write your message here and send it to us

    Professional technical engineer dedicated to guide you

    According to your actual needs, choose the most reasonable overall design and planning procedures