Top 10

of Chinese Stone Machinery

Modified Epoxy Sealing Primer Strong Adhesion Moisture Proof Coating

Introduction

Modified epoxy sealing primer is two component, favorable price, strong sealing permeability, can improve the strength of the substrate, good adhesion to the substrate, strong water resistance, and good compatibility with the topcoat.

Product Details

Product Tags

Product Description

Modified epoxy sealing primer is two component, favorable price, strong sealing permeability, can improve the strength of the substrate, good adhesion to the substrate, strong water resistance, and good compatibility with the topcoat.

Modified epoxy sealing primer paint is applied to concrete surface sealing coating, FRP. The floor primer paint is transparent. The material is coating and the shape is liquid. The packaging size of the paint is 4kg-20kg. Its characteristics are good adhesion to the substrate, strong water resistance.

Product Features

Epoxy cloud iron intermediate paint is a two-component coating composed of epoxy resin, flake mica iron oxide, modified epoxy curing agent, auxiliary agent, etc. It has good adhesion with the previous paint, excellent chemical resistance, hard film, good impact resistance and good wear resistance. It can have good inter layer adhesion with the back paint, and is matched with most high-performance finish paints.

Product Specifications

Color Product Form MOQ Size Volume /(M/L/S size) Weight/ can OEM/ODM Packing size/ paper carton Delivery Date
Series color/ OEM Liquid 500kg M cans:
Height: 190mm, Diameter: 158mm, Perimeter: 500mm,(0.28x 0.5x 0.195)
Square tank:
Height: 256mm, Length: 169mm, Width: 106mm,(0.28x 0.514x  0.26)
L can:
Height: 370mm, Diameter: 282mm, Perimeter: 853mm,(0.38x 0.853x 0.39)
M cans: 0.0273 cubic meters
Square tank:
0.0374 cubic meters
L can:
0.1264 cubic meters
3.5kg/ 20kg customized accept 355*355*210 stocked item:
3~7 working-days
customized item:
7~20 working days

uses

This product is used as the middle layer sealing coating of epoxy zinc-rich primer and inorganic zinc-rich primer to enhance the adhesion and protection performance of the entire coating. It can also be sprayed directly on the surface of steel treated by sandblasting as a primer.

After supporting

Epoxy, alkyd, polyurethane, acrylic, chlorinated rubber, fluorocarbon coatings.

Product Parameters

Appearance of coat The film is flat and dark
Color Iron red, gray
Drying time Surface drying ≤1H (23℃) Practical drying ≤24H (23℃)
Complete cure 7d
Ripening time 20min (23°C)
Ratio 10:1(weight ratio)
Recommended number of coating lines airless spraying, dry film 85μm
Adhesion ≤1 level (grid method)
Density about 1.4g/cm³
Re-coating interval
Substrate temperature 5℃ 25℃ 40℃
Short time interval 48h 24h 10h
Time length No limit (no zinc salt formed on the surface)
Reserve note Before coating the back paint, the front paint film should be dry, free of zinc salts and contaminants

Product features

Epoxy cloud iron intermediate paint is a two-component coating composed of epoxy resin, flake mica iron oxide, modified epoxy curing agent, auxiliary agent, etc. It has good adhesion with the front paint, excellent chemical resistance, good impact resistance and good wear resistance. It can have good inter layer adhesion with the back paint, and is matched with most high-performance finish paints.

Coating method

Construction conditions: The substrate temperature must be higher than 3℃, the substrate temperature during outdoor construction, below 5°C, epoxy resin and curing agent curing reaction stop, should not be carried out construction.

Mixing: The A component should be stirred evenly before adding the B component (curing agent) to blend, and thoroughly stirred evenly, it is recommended to use a power agitator.

Dilution: After the hook is fully matured, an appropriate amount of supporting diluent can be added, stirred evenly, and adjusted to the construction viscosity before use.

Safety measures

The construction site should have a good ventilation environment to prevent the inhalation of solvent gas and paint fog. Products should be kept away from heat sources, and smoking is strictly prohibited at the construction site.

First aid method

Eyes: If the paint spills into the eyes, wash immediately with plenty of water and seek medical attention in time.

Skin: If the skin is stained with paint, wash with soap and water or use an appropriate industrial cleaning agent, do not use large amounts of solvents or thinners.

Suction or ingestion: Due to the inhalation of a large amount of solvent gas or paint mist, should immediately move to the fresh air, loosen the collar, so that it gradually recover, such as ingestion of paint please seek medical attention immediately.

Storage and packaging

Must be stored in accordance with national regulations, the environment is dry, ventilated and cool, avoid high temperature and away from fire source.


  • Previous:
  • Next:

  • Write your message here and send it to us

    Professional technical engineer dedicated to guide you

    According to your actual needs, choose the most reasonable overall design and planning procedures